The Project, together with the DGSM, carried out a geo-hazard assessment aimed at assuring the financier that the railway is not affected by mudslides, floods or geological catastrophes. The report is ready and approved.
CONNECT WITH US
Standard Gauge Railway Uganda
Developing the Tororo-Kampala (Eastern) and Tororo -Amuru-Packwach (Northern) routes