This was to get Ministry of Works and Transport (MoWT) the engineering design, economic and financial parameters that would be a basis for engaging the contractor and the consultants
CONNECT WITH US
Standard Gauge Railway Uganda
Developing the Tororo-Kampala (Eastern) and Tororo -Amuru-Packwach (Northern) routes